As outlined in the FMP, the majority of our schools are 50-60 years old and in need of repairs. Facilities projects, for both Measure I and L, were identified through the FMP and brought forward to Board after completion of the document. With the enormous need outlined through FMP Process, the Facilities Program is focused on providing “Warm, Safe, and Dry” schools. This is related to roofing, mechanical (HVAC), and other needs at the school sites.   

Due to the nature of this work, projects are primarily completed during summer breaks when staff and students are not present on campus.

In Progress / Future Projects – Facilities

  • Measure I – Montgomery High School Classroom Building – In DSA Review
  • Measure I and L – Roofing and HVAC – Bid Fall 2018; Selected based on need:
    • Santa Rosa High Phase II - In DSA Review
    • Montgomery HS - In DSA Review
    • Santa Rosa MS - In DSA Review
    • Slater MS - In Progress - Completion Summer 2019
    • Abraham Lincoln - In Progress - Completion Summer 2019
  • Measure I and L Campus-wide Locks – Phase 2 Starting; Phase 3 - Out for Bid
  • Measure I and L Marquees –  Installing at five (5) sites
  • Measure L - Proctor Terrace Elementary Restroom - In Progress - Completion Summer 2019
  • Measure I Maria Carrillo Press Box - Press box selected and under fabrication, site package under design.

Completed Projects - Facilities - Summer 2018

  • Measure I – Maria Carrillo Synthetic Stadium Athletic Field Track
  • Measure I – Piner Stadium Field Lighting
  • Measure I – Roofing and HVAC –Elsie Allen HS*
  • Measure I – Roofing and HVAC – Maria Carrillo HS*
  • Measure I – Roofing and HVAC – Santa Rosa HS Phase I*
  • Measure L – Roofing and HVAC – James Monroe ES*
  • Measure L – Roofing and HVAC – Hilliard Comstock*
  • Measure I and L Marquees:
    • Albert Biella
    • Helen Lehman
    • Abraham Lincoln
    • James Monroe
    • Herbert Slater

*All of our schools are in need of roofing repairs as evidenced by the wettest winter in 10 years. These sites were selected based on roofing assessments and the review of work orders for every site.  These sites were determined to have the greatest need for roofing repairs.

Previously Completed Measure I and L Projects

  • Measure L – Santa Rosa Charter for the Arts
  • Measure L – Roofing and HVAC – Biella Elementary
  • Measure L – Roofing and HVAC – Hidden Valley Elementary
  • Measure L – Interior Reconditioning Room 1-6 – Hidden Valley Elementary
  • Measure L – Proctor Terrace – Playground Drainage Issues
  • Measure L – Proctor Terrace – Slurry and Striping
  • Measure I and L – Roofing and flooring repairs – Various Sites
  • Measure I and L – HVAC Replacement – Various Sites
  • Measure L – Burbank Elementary – Slurry and Striping
  • Measure L – Lehman Elementary – Slurry and Striping
  • Measure L – Hidden Valley Elementary – Slurry and Striping
  • Measure I – Portable Building Classrooms – Rincon Valley MS and Ridgway
  • Measure I – Cook Middle School – Slurry and Striping
  • Measure I – Carrillo High School – Slurry and Striping
  • Measure I – Slater Gymnasium Roofing Project
  • Measure I – Piner High School Roofing and HVAC
  • Measure I and L - Teacher Laptops – All sites
  • Measure I and L - Office computers – All sites - Classified staff
  • Measure I and L - Chromebooks for student use – All sites
  • Measure I and L - New Phone System - All sites (District Office completion Sept. 2018)
  • Measure I and L - Dark Fiber for dual Internet Connections
  • Measure I and L - Network Equipment - All Sites
  • Measure I and L - New Wireless Solution - All sites
  • Measure I and L - All-In-One Bell/Clock/Speakers - All Sites
  • Measure I and L - Upgraded Data Storage and Enterprise Level Backup Solution
  • Measure I and L - Structured Data Cabling - All sites